Civil works and erection
Access roads for blade transport, crane pads, and foundations to turbine loading.
Access roads capable of carrying blade and nacelle transport, crane pads sized for the erection crane, and foundations designed to the specific soil and the turbine loading. Transport access is frequently the constraint that decides whether a site is buildable at all.
What this includes
- Transport route survey for blade and nacelle
- Access road construction and widening
- Crane pad design and construction
- Soil investigation and foundation design
- Foundation execution and curing
- Turbine erection and mechanical completion
- What you receiveOutput
- Foundations complete and turbines erected
- When you need itTiming
- After turbine order, timed to delivery.
Discovering the blade cannot reach the site. Route survey after turbine order has stranded projects at the last road bend.
Delivered by our own team together with vetted specialist partners and, where the question needs it, a named member of our expert bench. We tell you who is doing the work before the engagement starts.
Other parts of wind
Wind resource measurement
Wind resource report with speed distribution and long term correlation
OpenMicrositing and layout
Turbine layout with predicted wake losses and per machine yield
OpenTurbine class and selection
Turbine recommendation with energy yield and loading justification
OpenElectrical and evacuation
Farm electrically complete and charged
OpenWind operations and maintenance
Contracted availability with condition monitoring reporting
Open