Civil works and erection

Access roads for blade transport, crane pads, and foundations to turbine loading.

In short

Access roads capable of carrying blade and nacelle transport, crane pads sized for the erection crane, and foundations designed to the specific soil and the turbine loading. Transport access is frequently the constraint that decides whether a site is buildable at all.

What this includes

  • Transport route survey for blade and nacelle
  • Access road construction and widening
  • Crane pad design and construction
  • Soil investigation and foundation design
  • Foundation execution and curing
  • Turbine erection and mechanical completion
What you receiveOutput
Foundations complete and turbines erected
When you need itTiming
After turbine order, timed to delivery.
The common mistake

Discovering the blade cannot reach the site. Route survey after turbine order has stranded projects at the last road bend.