Substation and evacuation

Switchyard, substation, transmission line, metering and protection to utility specification, through to charging.

In short

A switchyard and substation sized to the plant, the transmission line to the connection point with its right of way, metering and protection systems built to the utility specification, and the testing and charging sequence coordinated with the transmission utility through to commercial operation.

What this includes

  • Switchyard and substation design and construction
  • Transmission line construction to the connection point
  • Metering and protection to utility specification
  • Utility coordination and approval follow through
  • Testing, charging and synchronisation
  • Commercial operation date documentation
What you receiveOutput
Substation built and line charged, ready for commercial operation
When you need itTiming
In parallel with plant construction, planned from the feasibility stage.
The common mistake

Planning evacuation after the plant. A finished plant that cannot export earns nothing, and utility timelines do not compress to suit a developer.

How we staff this

Delivered by our own team together with vetted specialist partners and, where the question needs it, a named member of our expert bench. We tell you who is doing the work before the engagement starts.