Substation and evacuation
Switchyard, substation, transmission line, metering and protection to utility specification, through to charging.
A switchyard and substation sized to the plant, the transmission line to the connection point with its right of way, metering and protection systems built to the utility specification, and the testing and charging sequence coordinated with the transmission utility through to commercial operation.
What this includes
- Switchyard and substation design and construction
- Transmission line construction to the connection point
- Metering and protection to utility specification
- Utility coordination and approval follow through
- Testing, charging and synchronisation
- Commercial operation date documentation
- What you receiveOutput
- Substation built and line charged, ready for commercial operation
- When you need itTiming
- In parallel with plant construction, planned from the feasibility stage.
Planning evacuation after the plant. A finished plant that cannot export earns nothing, and utility timelines do not compress to suit a developer.
Delivered by our own team together with vetted specialist partners and, where the question needs it, a named member of our expert bench. We tell you who is doing the work before the engagement starts.
Other parts of solar, end to end
Resource assessment and feasibility
Feasibility report with yield estimate, uncertainty range and constraints
OpenDesign and engineering
Detailed project report, single line diagrams and construction drawings
OpenEquipment supply
Equipment delivered to site with test certificates and inspection records
OpenCivil and mechanical works
Mechanically complete plant ready for electrical works
OpenElectrical works
Electrically complete plant with test records, ready for charging
OpenGrid connection and approvals
Plant charged, synchronised and exporting under approval