Right of way for evacuation
Securing and documenting the corridor from the site to the connection point, as part of the main assembly.
By treating the evacuation corridor as part of the land assembly rather than as a later problem. The route is surveyed, the parcels it crosses are identified and their owners engaged on the same terms as the main site, and the right is documented and registered so it survives a change of landowner.
What this includes
- Corridor route survey and optimisation
- Identification of every parcel crossed
- Owner engagement and compensation on consistent terms
- Right of way grant drafting and registration
- Statutory route approvals where applicable
- Tower and pole location agreement
- What you receiveOutput
- Right of way secured, documented and registered along the full route
- When you need itTiming
- In parallel with the main land assembly, never after it.
Leaving the corridor until the plant is built. A single holdout on the route can strand a completed plant, and that owner knows it.
Delivered by our own team together with vetted specialist partners and, where the question needs it, a named member of our expert bench. We tell you who is doing the work before the engagement starts.
Other parts of land pooling and acquisition
Site identification and screening
Ranked site shortlist with constraints mapped per parcel
OpenRevenue record and title verification
Title report per parcel with red flags listed and a clear or drop recommendation
OpenOwner identification and engagement
Verified owner list with contact details and consent status per parcel
OpenNegotiation and commercial structuring
Signed term sheets or agreements to lease across the assembly
OpenLand use conversion and permissions
Conversion orders and permissions recorded against each parcel
OpenDeed drafting, execution and registration
Registered deeds, indexed and handed over as a complete set