BAASLAB Climate Change Solutions
Green hydrogen

Safety and code compliance

Containment, leak detection, ventilation, separation distances and statutory approvals.

In short

Hydrogen ignites across a wide range of concentrations and leaks through small gaps, so containment, detection, ventilation and separation distances are designed in from the start. Statutory approvals cover pressure vessels, storage and handling, and they are not retrofittable.

What this includes

  • Hazard and operability study
  • Leak detection and ventilation design
  • Separation distance and layout compliance
  • Pressure vessel and storage approvals
  • Emergency response planning
  • Operator training and procedures
What you receiveOutput
Safety design, hazard study and statutory approvals in place
When you need itTiming
From the first layout drawing, never after.
The common mistake

Treating safety as an approval to obtain at the end. Separation distances change the layout, and a layout fixed without them may not be approvable.

How we staff this

Delivered by our own team together with vetted specialist partners and, where the question needs it, a named member of our expert bench. We tell you who is doing the work before the engagement starts.